What does the Chip Seal Project consist of?

Between six and seven miles of streets are prepared each year by cutting out and replacing deteriorated areas of asphalt and in some areas a surface skin patch is installed as a leveling course. Usually at the end of August each year it takes approximately one week to install the oil and chips (3/8 inch gravel). This process seals the surface of the asphalt and provides an improved wearing surface.